
Didirikan 1983 · Shenzhen
Menjadi standar daya
industri.
CTT Cable Group merekayasa kabel tegangan tinggi, kontrol, data, dan khusus untuk proyek-proyek infrastruktur paling menantang di dunia.
Basis Produksi
Pemandangan pabrik nyata, kapabilitas pengirimannyata.

Ekstrusi presisi
Kontrol jalur otomatis untuk kinerja insulasi dan selubung yang dapat diulang.

Penanganan tugas berat
Pergerakan gulungan besar, penataan, dan pengiriman ditangani di dalam basis produksi.

Kesiapan pengiriman
Operasi pemuatan nyata untuk pesanan ekspor dan jadwal pengiriman berbasis proyek.
Skenario Aplikasi
Memberi daya pada proyek-proyek yang penting.

Pusat Data
Mission-critical power & fiber for hyperscale facilities.

Kota Pintar
Underground grids powering modern urban infrastructure.

Energi Baru
Solar farms, wind, EV charging and storage projects.
Kelautan & Pelabuhan
Salt-resistant armoured cables for offshore environments.

Kereta Api & Transit
Signal and traction cabling for metro and high-speed rail.

Bangunan Komersial
Low-smoke fire-resistant systems for premium towers.
FAQ
Questions EPC buyers ask us
How it works
How to source cables from CTT in four steps
- 01
Send your specification
Voltage rating, conductor, insulation, length, target standard and quantity.
- 02
Engineering confirmation
Our engineers confirm the cable construction within one business day and recommend the right product.
- 03
Quotation with certificates
A formal quote including lead time, certifications and test reports.
- 04
Production, QC & delivery
Batch production with traceable QC; shipped direct or via the Vietnam assembly base.
Manufacturer vs trading company
Why a factory is not a trading company
| Aspect | CTT Cable — the manufacturer | A trading company |
|---|---|---|
| Manufacturing | In-house extrusion, armouring and CNAS-accredited testing | Third-party sourcing, no factory of its own |
| Certification & QC | Factory-level ISO certificates, batch-traceable test data | Pass-through certificates, limited traceability |
| Engineering support | In-house engineers review your spec and propose the construction | Limited or no technical support |
| Delivery | Vietnam assembly base shortens Southeast Asia lead time by ~18 days | Ships from stock; longer lead for bespoke cables |
| Accountability | One accountable manufacturer for spec, QC and delivery | Multiple intermediaries to coordinate |
Regional partnership
A manufacturing partner across Southeast Asia — not just an exporter
Local assembly, SNI certification, metro references and dedicated regional teams — built for EPC and infrastructure projects in each market.
Vietnam
A 25,000 m² Phase 2 expansion of our Haiphong assembly and warehousing hub cuts average Southeast Asian lead times by ~18 days, keeping regional inventory close to Vietnamese project sites.
Explore Vietnam supplyIndonesia
Product range certified under the Indonesian National Standard (SNI) for cable imports under SNI marking — a key requirement for Indonesian projects.
Explore Indonesia supplyPhilippines
Aerial bundled cable, aluminium conductors and LV/MV power cable for utility distribution and rural electrification programs.
Explore Philippines supplyBerita & Acara
Dari lantai produksi dan lapangan.
18 Jun 2026
Seluruh Rangkaian TR & TM Kini Ber-SNI untuk Indonesia
Enam sertifikat SPPT SNI dari BSPJI Jakarta mencakup kabel 450/750 V, kabel fleksibel, dan kabel daya IEC 60502 hingga 30 kV — CTT Cable dapat memasok produk ber-SNI langsung ke proyek di Indonesia.
Tanya via WhatsApp →28 Mei 2026
Sertifikat IECEE CB Membuka 50+ Pasar Nasional
Sertifikat CB CN51702/03/04 seri IEC 60227, bersama persetujuan CE dan TÜV Rheinland, memungkinkan laporan kami dikonversi menjadi sertifikasi lokal tanpa uji ulang.
Tanya via WhatsApp →14 Mei 2026
Rekam Jejak Proyek Vietnam Diterbitkan
Dokumen proyek Vietnam kami mencakup pengiriman MRT, kawasan industri, dan gedung tinggi — didukung stok regional dan waktu tunggu 18 hari lebih singkat dari pabrik Haiphong.
Tanya via WhatsApp →